Steel Structure

Steel Structure Assembly and Construction Techniques

Master the complete process of steel structure assembly, from initial inspection to completion. Discover crucial tips for efficient and safe construction.

This article delves deep into the techniques of assembly and construction processes for steel structures. Starting with the preparation phase, which includes equipment and material inspection, it proceeds to detailed assembly steps, including main frame installation, roofing, and finishing. 

Readers will gain a comprehensive understanding of each stage of the process, from column and rafter installation to final closure and inspection. The article also highlights important points to consider before and during construction to ensure the safety and efficiency of steel structure projects.

1.The Process of Erection and Construction of Steel Structures

1.1 Inspection of Equipment and Supplies

Before starting the construction process, the first crucial step is to conduct a thorough inspection of all equipment and supplies to be used. This stage is critical for ensuring worker safety and the quality of the final construction.

Heavy Equipment Inspection:

  • Crane: Check lifting capacity, steel cable condition, and hydraulic systems.
  • Forklift: Ensure lifting systems and brakes are functioning properly.
  • Welding Equipment: Check the condition of welding machines, cables, and safety equipment.

Steel Material Inspection:

  • Specification verification: Ensure dimensions, strength, and steel grade match the design.
  • Visual inspection: Check for defects, corrosion, or damage on steel elements.
  • Certificate verification: Verify quality certificates from suppliers.

Safety Equipment:

  • PPE (Personal Protective Equipment): Helmets, gloves, safety shoes, protective goggles.
  • Height safety equipment: Harnesses, safety ropes, safety nets.
  • Fire extinguishers: Ensure availability and readiness for use.

Tools and Auxiliary Equipment:

  • Wrenches: Torque meters, spanners, adjustable wrenches in various sizes.
  • Measuring tools: Spirit levels, theodolites, laser meters.
  • Cleaning equipment: Wire brushes, grinders, sandblasting equipment if needed.

 

1.2 Erection and Construction of Steel Structures

Step 1: Install the Main Frame (Columns and Rafter Combination)

  • Columns
  1. Site Preparation:
    • Clean the foundation area of debris and dirt.
    • Mark column positions according to working drawings using paint or chalk.
  2. Column Lifting:
    • Use a crane with appropriate capacity to lift the columns.
    • Attach lifting slings or chains to designated points on the column.
    • Lift the column slowly and position it over the prepared base plate.
  3. Alignment and Plumbing:
    • Use a theodolite or laser measuring tool to ensure column verticality.
    • Adjust column position using wedges or adjusting tools until perfectly vertical and parallel.
  4. Anchor Bolt Tightening:
    • Install nuts on anchor bolts embedded in the foundation.
    • Tighten nuts gradually and evenly using a torque wrench.
    • Ensure the column remains vertical during the tightening process.
  5. Welding (if required):
    • If the design requires, perform welding between the column base plate and foundation plate.
    • Use appropriate welding electrodes and follow correct welding procedures.
  6. Final Inspection:
    • Recheck column verticality and alignment using a spirit level and theodolite.
    • Ensure all bolts are tightened to the appropriate torque.
  • Rafter Combination
  1. Pre-assembly:
    • If possible, assemble part or all of the rafters on the ground.
    • Ensure all connections are properly fitted and tight.
  2. Lifting:
    • Attach lifting slings or chains to designated points on the rafters.
    • Lift the rafters slowly using a crane, ensuring the load is balanced.
  3. Placement:
    • Guide the rafters to their position above the columns with the help of workers above.
    • Lower slowly and ensure rafter ends are precisely placed on the supports atop the columns.
  4. Connection:
    • Install connection bolts between rafters and columns.
    • Tighten bolts gradually, ensuring alignment is maintained.
  5. Bracing Installation:
    • Install diagonal and horizontal bracing according to the design to increase structural stability.
    • Tighten all bracing connections.
  6. Final Adjustment:
    • Check rafter alignment and level using measuring tools.
    • Perform final adjustments if necessary before permanently tightening all connections.
  7. Welding (if required):
    • If the design requires, perform welding on critical connections.
    • Follow correct welding procedures and use appropriate electrodes.

Step 2: Roofing Corrugated Iron and Installing the Cover

Roofing:

  1. Preparation:
    • Check roof support structures (purlins) to ensure correct and strong installation.
    • Clean the roof area of metal shavings or other debris.
  2. Measuring and Cutting:
    • Carefully measure the roof area and cut corrugated iron sheets to the required size.
    • Use appropriate cutting tools to ensure neat and safe cuts.
  3. Installing Roof Sheets:
    • Start installation from the bottom of the roof and move upwards.
    • Ensure overlap between sheets is according to manufacturer recommendations.
    • Use roof screws with rubber washers to prevent leaks.
  4. Installing Roof Accessories:
    • Install flashing, ridge caps, and other roof accessories to prevent leaks in critical areas.
    • Use special sealants to strengthen protection against water.
  5. Inspection:
    • Check the entire roof surface to ensure no loose screws or potentially leaking areas.
    • Ensure all joints are tight and properly installed.

Install Cover:

  1. Wall Installation:
    • If using wall panels, start installation from bottom to top.
    • Ensure panels are installed straight and parallel using a spirit level.
    • Use self-drilling screws with rubber washers for tightening.
  2. Window and Door Installation:
    • Install window and door frames according to the design.
    • Ensure all openings are tightly fitted to prevent water and air infiltration.
  3. Insulation Installation (if required):
    • Install insulation material on walls and roof according to specifications.
    • Ensure no gaps or missed areas in insulation installation.
  4. Finishing:
    • Install trim and flashing around openings and building corners.
    • Apply sealant to critical joints to ensure water tightness.
  5. Final Inspection:
    • Conduct a thorough inspection of all building coverings.
    • Ensure all elements are properly installed and there are no areas potentially experiencing leaks or other issues.

1.3 Inspection and Project Handover

The final stage of the steel structure construction process is a thorough inspection and project handover. This step is crucial to ensure that all work has been carried out according to the specified standards and specifications.

  1. Structural Inspection:
    • Check all connections, ensure bolts are tightened to the correct torque.
    • Verify alignment and level of the entire structure.
    • Inspect welding results if any, ensure there are no welding defects.
  2. Roof and Cover Inspection:
    • Check the tightness of the roof and walls, ensure there are no potential leaks.
    • Verify the installation of flashing and other accessories.
  3. System Testing:
    • Conduct load tests if necessary to ensure structural strength.
    • Check the roof drainage system to ensure water can flow properly.
  4. Documentation:
    • Collect all project documents, including as-built drawings, material certificates, and test results.
    • Prepare a final inspection report covering all aspects of construction.
  5. Walk-through with Client:
    • Conduct an inspection together with the client or project owner representative.
    • Explain every aspect of the construction and answer any questions that may arise.
  6. Final Fixes:
    • Note all items that require repair or adjustment.
    • Carry out necessary repairs before final handover.
  7. Handover:
    • Prepare project handover documents.
    • Conduct a formal handover process with the client or project owner.
  8. Warranty and Maintenance:
    • Provide information about the structure’s warranty and its components.
    • Provide maintenance guidelines to ensure the structure remains in optimal condition.

This comprehensive inspection and handover process ensures that the steel structure meets all required standards and specifications, and that the client is fully informed about the completed project.

2. Notes on Erection and Construction of Steel Structures

2.1 Before Construction

The success of any steel structure project hinges on meticulous planning and preparation before the first piece of steel is ever lifted into place. This crucial phase sets the foundation for the entire construction process, ensuring that every aspect of the project is carefully considered and accounted for.

At the heart of this preparatory stage is the development of a comprehensive project plan. This plan should encompass not only the technical aspects of the construction but also consider logistical challenges, resource allocation, and potential risks. A thorough structural analysis must be conducted, taking into account the specific requirements of the project, local environmental conditions, and applicable building codes. This analysis informs the creation of detailed working drawings, which serve as the blueprint for the entire construction process. These drawings should be precise and comprehensive, leaving no room for ambiguity or interpretation on the construction site.

Material selection is another critical aspect of the pre-construction phase. The quality of steel used in the structure can significantly impact its strength, durability, and overall performance. Therefore, it’s essential to carefully vet suppliers and verify that all materials meet or exceed the specifications outlined in the project design. This includes not only the structural steel itself but also all fasteners, welding materials, and auxiliary components. Each piece should be accompanied by proper certification, ensuring traceability and quality assurance.

Regulatory compliance is a non-negotiable aspect of any construction project. Before breaking ground, all necessary permits and approvals must be secured from relevant authorities. This process often involves submitting detailed plans, conducting environmental impact assessments, and demonstrating compliance with local zoning laws and building codes. It’s also crucial to thoroughly understand and prepare for adherence to safety regulations, as steel construction involves unique hazards that must be mitigated.

Site preparation is another key element of the pre-construction phase. A comprehensive site survey should be conducted to assess ground conditions, identify potential obstacles, and plan for the positioning of heavy equipment. This may involve clearing the site, establishing proper drainage, and creating access roads for the delivery of materials and movement of construction vehicles. Adequate staging areas must be designated for material storage and assembly of steel components.

Lastly, but certainly not least, is the preparation of the workforce. A well-trained team is essential for the safe and efficient execution of a steel construction project. This involves not only ensuring that all workers have the necessary skills and certifications but also conducting project-specific training sessions. These sessions should cover the unique aspects of the project, safety protocols, emergency procedures, and the proper use of specialized equipment. By investing in comprehensive team preparation, project managers can significantly reduce the risk of accidents and improve overall project efficiency.

2.2 During Construction

Once the preparatory phase is complete and construction begins, the focus shifts to executing the plan while maintaining the highest standards of safety, quality, and efficiency. The construction phase of a steel structure project is a complex choreography of various activities, all of which must be carefully coordinated and monitored.

Safety remains the paramount concern throughout the construction process. This goes beyond merely providing personal protective equipment (PPE) to workers, although that is certainly crucial. A comprehensive safety culture must be fostered, where every team member feels responsible for their own safety and that of their colleagues. Daily safety briefings should be conducted to address specific risks associated with the day’s tasks. These briefings also serve as an opportunity to reinforce general safety practices and address any concerns raised by the team. Special attention must be paid to fall protection measures, as working at height is an inherent part of steel construction. This includes the proper use of harnesses, the installation of guardrails, and the implementation of safety nets where appropriate.

Quality control is an ongoing process that touches every aspect of the construction. Each component must be inspected upon delivery to ensure it meets specifications and has not been damaged in transit. As the structure takes shape, regular inspections must be carried out to verify that all connections are properly made and tightened to the correct torque. Welding, where used, should be subject to rigorous quality checks, possibly including non-destructive testing methods such as ultrasound or X-ray inspection. Any deviations from the design or quality standards must be promptly addressed and corrected.

Effective material management is crucial to maintaining the flow of work and preventing costly delays. This involves not just ensuring a steady supply of materials to the site, but also properly storing and protecting them once they arrive. Steel components must be stored in a way that prevents damage or corrosion, which may involve providing cover from the elements and ensuring proper drainage in the storage area. A detailed inventory system should be implemented to track the use of materials and anticipate future needs.

Weather monitoring becomes a critical factor during the construction phase. Steel erection is particularly sensitive to wind conditions, and work may need to be halted if wind speeds exceed safe limits. Rain can also pose challenges, not only in terms of worker safety but also in potentially affecting the quality of welding work. Project managers must stay abreast of weather forecasts and be prepared to adjust the work schedule accordingly.

Clear and constant communication is the glue that holds the entire operation together. Regular coordination meetings should be held to discuss progress, address challenges, and plan upcoming work. These meetings should involve representatives from all key stakeholders, including the construction team, project management, and any relevant subcontractors. Open lines of communication must be maintained between workers on the ground and those managing the project to ensure that any issues or potential improvements can be quickly identified and acted upon.

As the project progresses, careful documentation of all activities becomes increasingly important. This includes maintaining daily logs of work completed, materials used, and any incidents or challenges encountered. Proper documentation not only aids in project management but also provides a valuable record for future reference and can be crucial in the event of any disputes or quality issues that may arise later.

Throughout the construction process, there must be a constant focus on adhering to the project schedule while maintaining flexibility to deal with unforeseen challenges. This requires ongoing monitoring of progress against the project timeline and the ability to reallocate resources or adjust work sequences as needed. At the same time, cost control measures must be implemented to ensure the project remains within budget. This involves tracking expenses, identifying potential cost overruns early, and finding ways to optimise resource use without compromising on quality or safety.

By maintaining a disciplined approach to these various aspects of the construction process, project teams can navigate the challenges of steel structure erection and deliver a final product that meets all specifications and stands as a testament to their skill and professionalism.

By paying attention to and implementing these important points, the process of erecting and constructing steel structures can proceed more safely, efficiently, and with high quality. Thoroughness at every stage, from planning to completion, will result in steel structures that are strong, safe, and in accordance with desired specifications.

It’s important to remember that each steel structure construction project has its own unique characteristics. Therefore, always adapt the approach and methods to the specific conditions of the project, local regulations, and client requirements. With a careful and professional approach, steel structure construction can be an effective and efficient solution for various modern building needs.

admin

Recent Posts

Benefits of Pre-Engineered Building – PEB Structures

Pre-engineered building (PEB) structures offer a revolutionary approach to modern construction, delivering unparalleled advantages in…

5 days ago

Top Steel Structure Companies in the World

The global steel structure industry is a highly competitive field with several standout companies renowned…

3 weeks ago

Top Steel Building Companies in Vietnam: An Overview of Industry Leaders

Vietnam’s construction industry has witnessed significant growth, with steel buildings becoming essential due to their…

4 weeks ago

Exploring Common Types of Steel Structures

Steel structures are integral to modern construction, offering unparalleled strength, versatility, and efficiency. From towering…

2 months ago

Cold-Formed Steel Structures: Advantages and Applications in Construction

Discover the advantages and applications of cold-formed steel structures in building construction. Cold-formed steel offers…

4 months ago

Steel Structure in Stadium Construction: Evolution and Benefits

Explore the steel structure in modern stadium construction, from its evolution to its advantages in…

4 months ago